 
        
        
      
    
    Clinton River Corridor
Cost: $4.5 Million
Fiduciary: City of Utica & City of Sterling Heights
Date Completed: Spring 2019
- 25 log jams containing approximately 385,000 cubic feet of debris were removed 
- 24 log vanes installed as streambank protection and habitat 
- Stabilized 7,600 feet of eroding riverbanks 
- The 9-mile stretch of the Clinton River through Sterling Heights and Utica is now navigable for the first time since the 1970s 
Photo Credit: HRC


